A lot happened this week:
- The raised garden bed was removed, and cement was poured.
- Three unused water fountains were removed, and the walls patched.
- Most baseboards and wallpaper were removed from the first phase rooms (B100-103).
- Lots of fixtures and cabinets have been rehomed.
- Eleven boxes of preschool books have been donated to 7 different preschools in the tri-city area.