A lot happened this week:  

  1. The raised garden bed was removed, and cement was poured.
  2. Three unused water fountains were removed, and the walls patched.
  3. Most baseboards and wallpaper were removed from the first phase rooms (B100-103).
  4. Lots of fixtures and cabinets have been rehomed.
  5. Eleven boxes of preschool books have been donated to 7 different preschools in the tri-city area.